What we were asked to do
Ensuring rapid drainage of rainwater in the loading, unloading, and handling yards of the new logistics area, reducing the risk of flooding and preserving ground stability. The drainage system had to withstand heavy loads and the stresses of intense and constant heavy traffic, while allowing for rapid installation, in line with the tight timelines of the construction site.
The context
The Bologna Interporto is one of the most strategic hubs in Italy and Europe for the flow of goods, an ecosystem where infrastructural efficiency and proper water management play a crucial role.
The hub is home to approximately 130 companies and 6,500 employees, with a total business turnover of 1.5 billion euros generated by the companies operating there.
The project
The project focused on identifying the most suitable drainage system for the yards of the new logistics area, correlating the hydraulic capacity of the channels with the expected operating loads.
The choice of channel cross-section and the load class of the grids took into account the operating conditions of the handling areas, subject to the passage and maneuvering of heavy vehicles. The selection of the solution also took into account the ease of installation, in line with the organizational needs of the construction site.
Greenpipe's solution: SMART PRO 200
The choice fell on the high-performance concrete channels SMART PRO 200 (H275), paired with ductile iron grids with load class D400, ideal for semi-trailers and trucks. For this project, 1,032 linear meters of drainage channels were supplied.
The SMART PRO concrete system offers excellent structural reliability and features an integrated iron profile built into the channel body, a solution that protects the edges from lateral mechanical stresses caused by heavy vehicles during steering and maneuvering.
The D400 load class ensures that the system remains intact even under the passage of semi-trailers and trucks, making it the ideal standard for loading and unloading yards and handling areas in distribution centers.
Among the advantages guaranteed by a choice of this kind are hydraulic capacity, since the H275 height allows for the management of significant water volumes, reducing the risk of flooding; durability, since the high-performance concrete ensures an extended service life and low maintenance costs; and installation speed, a determining factor in meeting the tight timelines of a construction site of this kind.
Project figures
in business generated by the companies operating within the infrastructure




